QS-131Grid voltage & grid connection25 kWp threshold (§9 EEG)

My new system in Germany has a 25 kW inverter. I want to add a solar fence next year and stay just under the 25 kWp limit. Does the limit count module power or inverter power, and does the fence count as part of the same system?

The 25 kW threshold in §9 EEG counts installed module power (kWp), not inverter power. Solar systems on the same plot or building that are commissioned within 12 consecutive calendar months count as one system for this test.

QS-161Grid voltage & grid connectionPost-20-year system + battery (§25 EEG)

A customer's 7.7 kWp system in Germany is more than 20 years old. It was built as a full feed-in system and the feed-in tariff has run out, but the inverter still works. She wants a battery. Does she need a new inverter, and is her exported power still paid?

No new inverter is needed for a battery. Keep the old one, switch the system from full feed-in to surplus feed-in, and add an AC-coupled battery behind the meter. Under the EEG, exported power from a post-20-year system is still paid until 31 December 2032, at the annual market value (capped at 10 ct/kWh) minus a marketing fee.

String inverter

Inverters · 4 answers

QS-127Operation & maintenanceRCD per inverter

Two inverters on one RCD to save space. OK?

Not with the recommended setup. SolarEdge requires one RCD per inverter; Solplanet says a shared RCD must be rated at least the sum, e.g. 200 mA for two.

PV array

Modules & connectors · 3 answers

Balcony solar kit + EV wallbox (German grid rules, EEG)

Design & grid rules · 1 answer

QS-191Design, connectors & modules800 VA plug-in limit vs. EV minimum charging power

An electric car is coming soon. A balcony solar kit may only feed max. 800 W into the house network, and that's single-phase? Kits with their own battery seem to be single-phase too. Do a balcony kit and an EV go together at all?

Only as a small top-up. Germany's plug-in solar rule covers kits with up to 800 VA of inverter power. A wallbox maker's manual says many electric cars need at least 1.4 kW to charge at all. So even in full sun, the balcony kit is below that minimum. If the start-up power is set lower, the rest comes from the grid; with a 1.4 kW start-up power (the manual's example), the car doesn't charge below that surplus.

Bifacial modules

Modules & connectors · 1 answer

German grid rules (EEG 2023, Solarspitzengesetz)

Design & grid rules · 1 answer

QS-109Meters, CTs & export controlNo feed-in payment at negative prices (§51 EEG)

My customer's new system in Germany will get a smart meter soon. Someone told him he then gets nothing for the power he exports when exchange prices are negative. Is that true, and from when?

Yes for systems commissioned from 25 Feb 2025: the feed-in payment drops to zero in every quarter-hour with a negative day-ahead price. Under 100 kW it only starts after the end of the calendar year in which the smart meter (iMSys) is installed, and the lost time is partly added at the end of the 20 years.

Hybrid inverter / battery (example: Alpha ESS)

Hybrid & backup systems · 1 answer

Hybrid inverter with grid meter / CT

Inverters · 1 answer

MC4 / Stäubli

Modules & connectors · 1 answer

QS-125Design, connectors & modulesCable gland torque

What torque do I use on an MC4 cable gland?

Stäubli's MC4 assembly instruction gives typical cable-gland tightening torque of 3.4–3.5 N·m, with a calibrated torque tool.

Modules / mounting

Modules & connectors · 1 answer

Modules / strings

Modules & connectors · 1 answer

Perovskite-silicon tandem modules

Modules & connectors · 1 answer

PV battery sizing (system design)

Design & grid rules · 1 answer

QS-163Design, connectors & modulesBattery size: HTW Berlin rules of thumb

I have about 11 kWp (east, south, west) on a hybrid inverter and use about 10 kWh a day. A plug-in hybrid car is charged mostly at night. Winter output is only 140–190 kWh a month in Nov–Dec. How big should the battery be? Does more always help, even if it never fills up in winter?

No. HTW Berlin's rules of thumb cap usable battery capacity at 1.5 kWh per kWp of PV and at 1.5 kWh per 1,000 kWh of yearly use, whichever is lower. Beyond that, each extra kWh adds very little self-sufficiency.

PV connectors

Modules & connectors · 1 answer

PV module

Modules & connectors · 1 answer

String design

Design & grid rules · 1 answer

String inverter with 2 MPPTs (example: Huawei)

Inverters · 1 answer

System design

Design & grid rules · 1 answer

Transformerless inverter

Inverters · 1 answer

Missing an answer for General & standards? Use the search above to send it to the research queue. We find a real thread and a primary source — nothing goes live until it is checked.

← All brands

Get new answers and videos

We only use your email for these updates. We never sell it or give it to others for their own use. Details in our privacy notice.