QS-161 · Grid voltage & grid connection

A customer's 7.7 kWp system in Germany is more than 20 years old. It was built as a full feed-in system and the feed-in tariff has run out, but the inverter still works. She wants a battery. Does she need a new inverter, and is her exported power still paid?

The short answer
No new inverter is needed for a battery. Keep the old one, switch the system from full feed-in to surplus feed-in, and add an AC-coupled battery behind the meter. Under the EEG, exported power from a post-20-year system is still paid until 31 December 2032, at the annual market value (capped at 10 ct/kWh) minus a marketing fee.

Plain explanation

Once the 20-year tariff ends, the EEG calls the system 'ausgefördert'. It may keep feeding in. §21 (1) Nr. 4 EEG 2023 gives post-20-year systems a feed-in payment. §23b sets the rate at the annual market value, capped at 10 cents per kWh from 2023. §53 (4) deducts a marketing fee that the transmission system operators publish, and halves that fee if the system has a smart meter (iMSys). §25 (2) says this payment runs until 31 December 2032. That small payment is why a battery now makes sense: every kWh used at home saves a full grid kWh. A full feed-in system sends all of its power to the grid through its own meter, so the house never sees it. The first job is to switch to surplus feed-in, so the solar power feeds the house first and only the rest is exported. That means a meter change and possibly work on the meter cabinet. Agree it with the grid operator and have a registered electrician do it. A working old inverter can stay. An AC-coupled battery connects on the AC side and charges from the surplus it measures at the grid connection point, so the PV side isn't touched. A new hybrid inverter only makes sense if the old one fails or you want backup power. Register the battery in the Marktstammdatenregister. §5 MaStRV requires units to be registered within one month of commissioning. To size it, see our HTW Berlin rule of thumb (qs-163). Law text as published on gesetze-im-internet.de on 16 Nov 2026. Germany's EEG is under revision, so re-check the rules before you sign anything. Not legal advice.

Steps from the source

  1. Confirm the old inverter still runs without faults
  2. Ask the grid operator to switch the system from full feed-in (Volleinspeisung) to surplus feed-in (Überschusseinspeisung); a registered electrician does the meter-cabinet work
  3. Add an AC-coupled battery with its own meter/CT at the grid connection point; no change on the PV side
  4. Register the battery in the Marktstammdatenregister within one month of commissioning (§5 MaStRV)
  5. Size the battery with the HTW Berlin rules of thumb (see qs-163)
"Abweichend von Absatz 1 ist die Einspeisevergütung nach § 19 Absatz 1 Nummer 2 in Verbindung mit § 21 Absatz 1 Satz 1 Nummer 4 bei ausgeförderten Anlagen bis zum 31. Dezember 2032 zu zahlen."

Word for word from the source.

Source

EEG 2023 §21, §23b, §25 and §53, and MaStRV §5 (gesetze-im-internet.de), EEG 2023 §25 Abs. 2 (payment until 31.12.2032); §21 Abs. 1 Nr. 4 https://www.gesetze-im-internet.de/eeg_2014/__21.html; §23b https://www.gesetze-im-internet.de/eeg_2014/__23b.html; §53 Abs. 4 https://www.gesetze-im-internet.de/eeg_2014/__53.html; MaStRV §5 Abs. 1 and 5 https://www.gesetze-im-internet.de/mastrv/__5.html. checked 2026-11-16 (Vilnius)www.gesetze-im-internet.de ↗

Where installers ask this

General guidance based on the manufacturer's manual or the named source. Always follow the current manual for your exact model and your national code. DC and AC electrical work is for qualified installers only. Not affiliated with or endorsed by any brand named; trademarks belong to their owners.