Ask a question
QS-164 · Backup & off-grid output

I'm planning a Sungrow SH25T with battery and want the whole house on its backup output. I also have existing micro-inverters. Can they keep running in the island grid during a power cut and charge the Sungrow battery? Sungrow's Australian documents describe this.

The short answer
Not in Europe. Sungrow's SH5T–SH25T user manual says connecting a PV inverter to the hybrid's LOAD (backup) terminal 'is not available in the European region'. Connect the micro-inverters on the grid side instead. They will charge the battery while the grid is up and switch off in a power cut.

Plain explanation

Sungrow's user manual for the three-phase SH5T–SH25T hybrids (version 17, December 2025) shows two ways to add an existing PV inverter. The first is on the grid side: the PV inverter's AC output runs in parallel with the hybrid's GRID terminal. Its power goes to the house loads first and then charges the battery. The second is on the LOAD terminal, so the PV inverter can keep working off-grid. The manual says this option is not available in the European region. The Australian guide the poster found explains how that second option works there. In backup, the hybrid forms the grid. When the battery and loads are satisfied, it raises the frequency to 52 Hz so the other inverter shuts down. 'Frequency Shift Power Control' has to be switched on, and the other inverter must not be bigger than the hybrid (kW per phase) and must respond to frequency shift. That is an Australian setup, not a European one. So for a German install: put the micro-inverters on the grid side. While the grid is up they feed the house and the battery charges from their surplus. In a power cut they disconnect, and only PV on the hybrid's own DC inputs and the battery supply the backup loads. If you want solar in a power cut, put more modules on the SH25T's own PV inputs. The manual also says that with third-party inverters, the meter needs 2 CTs: CT1 at the grid port and CT2 at the AC output of the third-party inverters.

Steps from the source

  1. Wire the existing micro-inverters to the grid side (in parallel with the hybrid's GRID terminal), not to the LOAD/backup terminal
  2. With third-party inverters, fit 2 CTs to the Sungrow meter: CT1 at the grid port, CT2 at the third-party inverters' AC output
  3. If you need solar during a power cut, connect modules to the SH25T's own PV inputs
  4. Ask Sungrow Europe in writing before deviating from the EU manual
"The AC terminal of the PV inverter and the LOAD terminal of the hybrid inverter are connected in parallel. This option is not available in the European region."

Word for word from the source.

Source

Sungrow, SH5T/6T/8T/10T/12T/15T/20T/25T Three-Phase Hybrid Inverter User Manual (SH5_6_8_10_12_15_20_25T-UEN-Ver18-202512), Section 2 'Product Description': 'On-grid Port to Retrofit the Existing PV System' and 'Load Terminal to Retrofit the Existing PV System' with notes (pp. 18–19). Australian context: Sungrow Australia guide 'Connecting an inverter to the Backup circuits of a Sungrow Hybrid' (GD_202409, V1.0) https://service.sungrowpower.com.au/GD_202409_Sungrow%20Hybrid_Connect%20Grid%20Inverter%20to%20Backup_V1.0.pdf. checked 2026-11-16 (Vilnius)info-support.sungrowpower.com ↗

Where installers ask this

General guidance based on the manufacturer's manual or the named source. Always follow the current manual for your exact model and your national code. DC and AC electrical work is for qualified installers only. Not affiliated with or endorsed by any brand named; trademarks belong to their owners.