The short answer
Check the DIP switch (BCU1) or terminal resistor (BCU2), then restart in the defined order.
Plain explanation
From the BYD manual for the Battery-Box Premium HVS/HVM: Read the code from LED flashes. Installer checks DIP switch (BCU1) or terminal resistor (BCU2). The rest of the checklist is below; work through it in order. Installer only: DC and AC work on a live PV system is dangerous, so owners should note the code and call their installer.
Steps from the source
- Read the code from LED flashes
- Installer checks DIP switch (BCU1) or terminal resistor (BCU2)
- Remove the topmost module as described if needed
- Restart in defined order
Source
BYD Battery-Box Premium HVS/HVM Service Guideline & Checklist (BCU2.0) V1.1, 2025-08-08, §2.9 EC103www.bydbatterybox.com ↗
Where installers ask this
- SMA Wechselrichter mit BYD-Batterie (terminal resistor) (r/DeutschePhotovoltaik)
- reddit.com/r/DeutschePhotovoltaik/comments/1vjn81v/
General guidance based on the manufacturer's manual or the named source. Always follow the current manual for your exact model and your national code. DC and AC electrical work is for qualified installers only. Not affiliated with or endorsed by any brand named; trademarks belong to their owners.