Ask a question
QS-007 · Insulation, earth & leakage faults

SMA event 901 PE connection missing. What's needed?

The short answer
Make sure PE is connected to the inverter.

Plain explanation

From the SMA manual for the Sunny Boy: Installer ensures PE connected. Installer only: DC and AC work on a live PV system is dangerous, so owners should note the code and call their installer.

Steps from the source

  1. Installer ensures PE connected

Source

SMA Sunny Boy 3.0-5.0 Operating Manual (SB30-50-1AV-40-BE-en-10), §12.2files.sma.de ↗

Where installers ask this

General guidance based on the manufacturer's manual or the named source. Always follow the current manual for your exact model and your national code. DC and AC electrical work is for qualified installers only. Not affiliated with or endorsed by any brand named; trademarks belong to their owners.

Get new answers and videos

We only use your email for these updates. We never sell it or give it to others for their own use. Details in our privacy notice.